Environmental Policy
About This Report
Message from the Chairman
Message from the Permanent Secretary
Business Overview and
Environmental Management
Structure
Significant Environmental Aspects
Performance Review
 
Water
Air
Noise
Energy
Waste Reduction & Recycling
Procurement, Greening & Awareness
Our Targets and Initiatives for 2002/2003 and beyond
Verification Statement
Annex
 
A) Summary of Feedback
B) Summary of Past Performance
C) Future Targets and Initiatives
Feedback Form

In the past year, we have removed a further 3% of the known asbestos from our estates. Since we started our Asbestos Abatement Programme in 1989, we have removed 90.7% and set targets to remove the rest. All asbestos removal is carried out in accordance with the requirements of the Air Pollution Control Ordinance. For buildings where asbestos remains, we continue to closely monitor their condition until they are abated.

Under Phase 3 of our joint asbestos investigation and management programme with EPD, we surveyed a further 126 schools in public housing estates and are now reviewing the results. To date, we have surveyed 245 schools. There is no imminent risk of asbestos fibre release in schools. Nevertheless, we have taken action to monitor and abate asbestos containing materials.
After discussions with EPD, we arranged trials on collecting and disposing of spent fluorescent lighting tubes and other mercury containing lamps at 2 estates and demolition sites. This is so we can prepare for when regulations come into force requiring mercury-containing lamps to be disposed of safely in accordance with the Waste Disposal (Chemical Waste) (General) Regulation.



<< Prev