Construction |
Abate
a further 5% of the remaining asbestos containing materials
(ACMs) in existing HA managed properties |
 |
Promote
healthy living and green environment |
|
 |
Implement
planned asbestos abatement programme e.g. estate redevelopment
programme & asbestos removal works |
|
%
of total remaining asbestos removed |
3% |
2% |
- |
- |
 |
Reduce
electricity consumption of landlord services installation in
new domestic blocks |
 |
Minimise
the use of resources and promote sustainable development
by promoting energy efficiency and waste reduction |
|
 |
Adopt
Energy Codes |
|
%
of electricity saving in new designs compared to existing designs
for landlord services installations in domestic blocks |
3% |
6% |
12% |
12% |
 |
Reduce
water wastage in large diameter bored piling (LDBP) works |
 |
Minimise
environmental impacts |
|
 |
Adopt
water recycling system in the construction of LDBP |
|
%
of sites adopting water recycling systems |
20% |
30% |
40% |
50% |
 |
Green
treatment to newly formed slopes |
 |
Promote
healthy living and green environment |
|
 |
Soil
slopes to be hydroseeded |
 |
Hard
surface to be softened by planting of creepers or colour
treatment, or with tree planting in pits |
|
Total
area of green slope 'greened' each year (sq.m) |
190
000 |
14
000 |
5
700 |
- |
 |
Estate
Management |
Reduce
noise nuisance from water pumps in PRH estates |
 |
Minimise
environmental impacts |
|
 |
Replace
3 000 rpm water pumps with
1 500 rpm pumps |
|
No.
of pumps to be replaced |
82 |
32 |
71 |
38 |
 |
Reduce
potable water comsumption for installations under landlord control
in PRH estates |
 |
Minimise
the use of resources by reducing wastage |
|
 |
Use
self stopping water tap and reduce pipe bursting &
leakage through replumbing programme |
|
%
of saving (compared with previous year) |
0.5% |
0.5% |
0.5% |
0.5% |
 |
Upgrade
the standard of the existing landscape facilitles in 18 selected
PRH estates |
 |
Promote
healthy living and green environment |
|
 |
Landscape
Improvement Programme through Landscape Improvement Teams |
|
No.
of plants planted |
450
000 |
450
000 |
500
000 |
500
000 |
 |
Promote
green environment at 24 PRH estates |
 |
Promote
healthy living and green environment |
|
 |
Green
planting through Estate Management Advisory Committees |
|
No.
of plants planted |
100
000 |
100
000 |
102
000 |
102
000 |
 |
Improvement
to the slope appearance in existing PRH estates |
 |
Promote
healthy living and green environment |
|
 |
Green
treatment to hard surfaced slopes and improvement to existing
vegetated slopes |
 |
Chunam
surface to be improved with hydroseeding, stone pitching
and toe planters |
|
No.
of slopes to be visually enhanced |
50 |
70 |
50 |
50 |
 |
Increase
domestic waste recovery rate |
 |
Minimise
the use of resources by reducing waste |
|
 |
Continute
publicity activities such as Waste Recycling Credit Scheme |
 |
Expand
scheme on Enhancement of Waste Recovery by placing waste
recycling bins on each floor of the block and at open
space by phases in 3 years starting from 2001/02 |
 |
Investigate
& trial collection of other types of recyclable materials |
|
%
waste recovery rate
Paper:
Aluminium cans:
Plastic:
Used clothes:
Walkie-talkie/
mobile phone batteries: |
20%
25%
1% |
25%
30%
2%
10%
1% |
30%
35%
3%
10%
3% |
35%
40%
4%
15%
5% |
 |
Reduction
of domestic waste |
 |
Minimise
the use of waste resources by reducing and address environmental
concerns |
|
 |
Promote
waste reduction through various publicity campaigns (Environmental
Family Cometition EMAC newsletters and other joint activities
with green groups) |
|
%
reduction in domestic waste per person per day |
1% |
2% |
3% |
4% |
 |
Office |
Reduce
A3 and A4 paper consumption in all HD offices except site offices |
 |
Minimise
the use of resources and promote awareness and participation
among staff |
|
 |
Various
initiatives* inc. publicity, training, competitions, provision
of recycling bins, and encouragement for use of electronic
media |
|
Reams
of paper consumed per staff member per year |
12.3 |
12.1 |
11.9 |
11.7 |
 |
Collection
of waste paper in all HD offices except site offices |
 |
Minimise
the use of resources by reducing waste and promote awareness
and participation among staff |
|
 |
Various
initiatives* |
|
%
saving compared to previous year |
5% |
2% |
2% |
2% |
 |
Community |
Increase
community environmental awareness in PRH estates |
 |
Promote
environmental awareness among residents |
|
 |
Publicity
and competitions.
Awareness to be measured by opinion survey conducted in
PRH estates |
|
%
of residents aware of HA environmental initiatives |
48% |
49% |
50% |
55% |
 |
Increase
in community participation in environmental activities in PRH
estates |
 |
Promote
awareness and participation among residents |
|
 |
Publicity,
competitions, activities. Results to be measured by opinion
survey conducted in PRH estates |
|
%
of residents who have participated in environmental activities |
62% |
63% |
64% |
65% |
 |
Increase
in use of recycling bins in PRH estates |
 |
Minimise
the use of resources by focusing on waste reduction |
|
 |
Publibity,
competitions, increased number of bins.
Results to be measured by opinion survey conducted in
PRH estates |
|
%
of residents who had used waste bins at least once |
57% |
59% |
61% |
63% |
 |